Landed House Rebuilds in Singapore
Down to the ground, then a new house on the same plot.
Rebuild, or the other thing?
Five ways that separate the routes. Everything here is decided before design starts - which is why it is worth reading now.
Compared with
What it is
Rebuild
Down to the ground, then a new house on the same plot.
Reconstruction
The frame stays. Everything around it is new.
How long it takes
Rebuild
18–22 months of construction.
Reconstruction
15–18 months of construction.
What decides it
Rebuild
Whether the plot supports the house you want.
Reconstruction
Whether the existing structure can carry it.
What needs approving
Rebuild
Full submission, lodged before construction begins.
Reconstruction
Full submission, against what is being retained.
What you end up with
Rebuild
A brand new house, with nothing inherited.
Reconstruction
A new house with a familiar structure.
FAQsThe things people ask before they commit.
When the plot supports the house you want and the existing one does not — either because it is past economic repair, or because its structure fixes a layout you cannot live with. If the frame is sound and the problem is the plan, a reconstruction or an A&A will get you there faster.
Eighteen to twenty-two months of construction on a typical detached rebuild: demolition, the build, fit-out and TOP. Site conditions are what move the number.
Our real estate development background allows us to apply buildability reviews, structural coordination, and cost planning early in the design stage. By resolving technical details upfront, we reduce the likelihood of costly surprises and unnecessary variation orders during construction.
No. A rebuild means the house comes down, so you move out for the whole build. The programme tells you the date you need to be out and the date you can expect to move back, so you can arrange your accommodation in good time.